Road and Railway Construction with Beilite Hydraulic Breakers

Beilite hydraulic breakers are engineered for high efficiency and reliability in road and railway construction projects. With superior impact power and precision control, they excel at breaking asphalt, reinforced concrete, and bedrock during foundation preparation and maintenance. Their robust structure and low-vibration design enhance operator comfort and reduce equipment wear, ensuring consistent performance in demanding environments. Beilite breakers help accelerate infrastructure development by offering durable and cost-effective solutions for all types of construction tasks.

Applications

Road Surface & Asphalt Breaking

Railway Bed & Foundation Preparation

Bridge & Tunnel Demolition

Maintenance & Reconstruction Works

Beilite Hydraulic Breakers for Road and Railway Construction

Beilite hydraulic hammers deliver reliable, high-impact force for infrastructure projects. Ideal for road widening, rock excavation, pavement removal, bridge repair, and railway track bed preparation in diverse terrain.

Hydraulic Hammer Breakers  for Road and Railway Construction Compatibility With Wide Excavators

Model Chisel Suitable Excavator Working Flow Working Pressure Impact Frequency
BLTB-40 40mm 0.5t-1.2t 15-30 L/min 90-120 bar 800-1400 bpm
BLTB-45 45mm 0.8t-1.5t 20-40 L/min 90-120 bar 700-1200 bpm
BLTB-53 53mm 1.5t-3.5t 20-50 L/min 90-120 bar 600-1100 bpm
BLTB-60 60mm 3t-5t 30-60 L/min 100-130 bar 500-1000 bpm
BLTB-70 70mm 4.5t-6t 40-70 L/min 110-140 bar 500-900 bpm
BLTB-75 75mm 6t-8.5t 50-90 L/min 120-150 bar 400-800 bpm
BLTB-85 85mm 7t-11t 60-100 L/min 130-160 bar 400-800 bpm
BLTB-100 100mm 10t-14t 80-110 L/min 150-170 bar 350-700 bpm
BLTB-125 125mm 14t-18t 90-120 L/min 150-170 bar 350-650 bpm
BLTB-135 135mm 18t-22t 100-150 L/min 160-180 bar 350-500 bpm
BLTB-140 140mm 20t-24t 120-180 L/min 160-180 bar 350-500 bpm
BLTB-150 150mm 24t-27t 130-190 L/min 180-200 bar 200-300 bpm
BLTB-155 155mm 27t-33t 180-240 L/min 200-220 bar 200-300 bpm
BLTB-165 165mm 33t-38t 200-260 L/min 210-230 bar 150-300 bpm
BLTB-175 175mm 40t-45t 220-270 L/min 230-250 bar 130-200 bpm
BLTB-190 190mm 45t-55t 240-290 L/min 250-270 bar 100-140 bpm
BLTB-195 195mm 50t-60t 260-310 L/min 260-280 bar 100-140 bpm
BLTB-200 200mm 50t-65t 280-330 L/min 280-300 bar 100-130 bpm
BLTB-205 205mm 55t-75t 320-380 L/min 280-300 bar 100-130 bpm
BLTB-210 210mm 60t-90t 340-400 L/min 280-300 bar 90-120 bpm
BLTB-215 215mm 65t-95t 350-410 L/min 280-300 bar 90-120 bpm
BLTB-220 220mm 70t-100t 370-430 L/min 300-330 bar 80-110 bpm
BLTB-230 230mm 75t-110t 400-460 L/min 300-330 bar 80-110 bpm
BLTB-235 235mm 75t-120t 420-480 L/min 300-330 bar 80-110 bpm
BLTB-255 255mm 90t-130t 450-550 L/min 300-330 bar 70-100 bpm
BLTB-260 260mm 90t-160t 490-590 L/min 300-330 bar 70-100 bpm

Road and Railway Construction Focus on

Beilite hydraulic breakers are essential tools for excavators, mini-excavators, and backhoes in large-scale linear infrastructure development where breaking hard, often rocky, materials is necessary.

Road Construction and Maintenance 

Rock Excavation: Breaking up hard rock formations and boulders in hilly or mountainous terrain for road widening, cutting, and embankment preparation, especially where blasting is restricted.

Pavement and Slab Removal: Rapid demolition and fragmentation of old concrete roads, asphalt pavements, and bridge decks during reconstruction and repair projects to clear the site quickly.

Trenching for Utilities: Excavating trenches in hardened ground for the installation of drainage systems, culverts, and utility lines alongside new or existing roadways.

Tunneling and Cut-and-Cover: Breaking rock and concrete for the construction of road tunnels and underpasses.

Railway Construction and Maintenance 

Trackbed Preparation: Breaking rock and stabilized earth to achieve the precise grade and foundation required for laying railway ballast and tracks, ensuring a stable and safe line.

Bridge and Overpass Demolition: Dismantling old railway bridges, viaducts, and concrete overpasses with controlled breaking power for replacement or modernization projects.

Tunnel Boring Preparation: Used to break up and remove rock ahead of Tunnel Boring Machines (TBMs) or for the controlled enlargement of railway tunnels.

Ballast Removal: Breaking up and loosening old, cemented railway ballast that needs to be replaced during major track maintenance or rehabilitation works.